WHB Wehmeyer

Back to overview
Production Hall in Güglingen School in Assen (NL)

Sophienhof Frankfurt

Timber frame structure: Kaufmann Bausysteme GmbH.

The Sophienhof was designed as a passive house and approximately 20,000 square metres of prefabricated, insulated wall elements were installed.


Client
Frankfurter Aufbau AG
Construction period
February 2006 – September 2006